Westland Bunker Data Center

You are here: Home / Work / Projects / Westland Bunker Data Center

Westland Bunker Data Center

Industrial

Scope of Work

Demolition:

  • Remove existing fortified bunker entrance from 15’above grade to 30’ below grade
  • 24” thick concrete structure
  • Tie into existing bunker

Earthwork:

  • Strip site of existing vegetation and trees
  • Excavate and Stock Pile 30,000 yards of existing soils
  • Back fill basement walls and install french drain system

Underground:

  • Complete storm sewer systems
  • 85’ underground bore, 19’ deep

Concrete:

  • 120,000 sf two building built into the side of a hill
  • 1,500 LF of 23’ tall basement walls
  • 32 spread footings
  • 37,000 sf of paving and drives

See the expansion underway!


DIFFCO, LLC
PO Box 178
Cypress, TX 77410

Delivering Value in
Industrial Construction

Site Links

  • About Us
  • Services
  • Safety
  • Projects
  • Contact Us
  • Careers
  • E-news

Accreditation


© 2018 Copyright - Diffco
  • Facebook
  • Linkedin
  • About Us
  • Services
  • Safety
  • Projects
  • Contact Us
  • Careers
  • E-news
Kinder Morgan | Clinton Dr. Terminal Lubrizol Maintenance Bldg
Scroll to top