Slay Industries

Schlumberger

Westland Bunker Data Center

Scope of Work

Demolition:

  • Remove existing fortified bunker entrance from 15’above grade to 30’ below grade
  • 24” thick concrete structure
  • Tie into existing bunker

Earthwork:

  • Strip site of existing vegetation and trees
  • Excavate and Stock Pile 30,000 yards of existing soils
  • Back fill basement walls and install french drain system

Underground:

  • Complete storm sewer systems
  • 85’ underground bore, 19’ deep

Concrete:

  • 120,000 sf two building built into the side of a hill
  • 1,500 LF of 23’ tall basement walls
  • 32 spread footings
  • 37,000 sf of paving and drives

See the expansion underway!

Kinder Morgan | Clinton Dr. Terminal

Scope of Work:

  • Haul Drive Construction
Phillips 66 Sweeny project

Phillips 66 Sweeny

Sweeny, TX

Scope of Work:

High voltage building

  • Earthwork
  • Import of fill
  • Building Pad installation
  • Turn-key concrete
  • Drilled piers

NRG

Scope of Work

  • Excavation
  • Import/ compact fill
  • Soil stabilization
  • Installation of road base
Oxiteno Tank

Oxiteno Tank Farm

Scope of Work

  • Ground up facility addition
  • Clearing and grubbing
  • Soil stabilization and grading 
  • Cast in place structural concrete

Kinder Morgan

Scope of Work

  • Demolition
  • Excavation
  • Structural Concrete placement

Oklahoma Gas & Electric

Scope of Work

  • Remove existing parking lot and structures
  • Re-grade and stabilize
  • Reinforce, place and finish new parking lot

Greene Tweed

Client

Greene Tweed Gasket Co.

Scope of Work

  • Ground up building
  • Site demolition
  • Earthwork
  • Building pad
  • Soil Stabilization
  • Concrete foundations and paving