Westland Bunker Data Center
Scope of Work
Demolition:
- Remove existing fortified bunker entrance from 15’above grade to 30’ below grade
- 24” thick concrete structure
- Tie into existing bunker
Earthwork:
- Strip site of existing vegetation and trees
- Excavate and Stock Pile 30,000 yards of existing soils
- Back fill basement walls and install french drain system
Underground:
- Complete storm sewer systems
- 85’ underground bore, 19’ deep
Concrete:
- 120,000 sf two building built into the side of a hill
- 1,500 LF of 23’ tall basement walls
- 32 spread footings
- 37,000 sf of paving and drives
See the expansion underway!
Kinder Morgan | Clinton Dr. Terminal
Scope of Work:
- Haul Drive Construction
Phillips 66 Sweeny
Sweeny, TX
Scope of Work:
High voltage building
- Earthwork
- Import of fill
- Building Pad installation
- Turn-key concrete
- Drilled piers
NRG
Scope of Work
- Excavation
- Import/ compact fill
- Soil stabilization
- Installation of road base
Oxiteno Tank Farm
Scope of Work
- Ground up facility addition
- Clearing and grubbing
- Soil stabilization and grading
- Cast in place structural concrete
Kinder Morgan
Scope of Work
- Demolition
- Excavation
- Structural Concrete placement
Oklahoma Gas & Electric
Scope of Work
- Remove existing parking lot and structures
- Re-grade and stabilize
- Reinforce, place and finish new parking lot
Greene Tweed
Client
Greene Tweed Gasket Co.
Scope of Work
- Ground up building
- Site demolition
- Earthwork
- Building pad
- Soil Stabilization
- Concrete foundations and paving