Schlumberger

Rice University

Lubrizol Maintenance Bldg

, , ,

Westland Bunker Data Center

Scope of Work

Demolition:

  • Remove existing fortified bunker entrance from 15’above grade to 30’ below grade
  • 24” thick concrete structure
  • Tie into existing bunker

Earthwork:

  • Strip site of existing vegetation and trees
  • Excavate and Stock Pile 30,000 yards of existing soils
  • Back fill basement walls and install french drain system

Underground:

  • Complete storm sewer systems
  • 85’ underground bore, 19’ deep

Concrete:

  • 120,000 sf two building built into the side of a hill
  • 1,500 LF of 23’ tall basement walls
  • 32 spread footings
  • 37,000 sf of paving and drives

See the expansion underway!

Concrete Industrial Construction

Noble Energy Tower

Scope of Work:

  • Decorative and radiused poured in place concrete walls
  • Paving
  • Soil Stabilization
  • Stamped, stained and colored concrete

 

concrete pour
,

FedEx Building Addition

Scope of Work:

  • 65,000 s.f.  build 
  • Turn key structural concrete
  • Paving
  • Earthwork
  • Storm sewer
turn-key concrete

Holman Boiler

Scope of Work:

  • Turn-key concrete for tilt-wall manufacturing facility
Site Demolition, Excavation of detention pond, grading and lime stabilization, Structural cast in place concrete walls, Structural fill, foundations, paving
, ,

City of Houston Waste Depository

Scope of Work:  

  • Site Demolition
  • Excavation of detention pond
  • Grading and lime stabilization
  • Structural cast in place concrete walls
  • Structural fill
  • Multiple building foundations and paving
Phillips 66 Sweeny project
,

Phillips 66 Sweeny

Sweeny, TX

Scope of Work:

High voltage building

  • Earthwork
  • Import of fill
  • Building Pad installation
  • Turn-key concrete
  • Drilled piers
,

Duke Glass Manufacturing

Scope of Work:

  • Paving addition
  • Soil stabilization & grading
  • Concrete paving