HPH Webster

Texana Fulshear Phase 1

Lubrizol Maintenance Bldg

Noble Energy Tower

Scope of Work:

  • Decorative and radiused poured in place concrete walls
  • Paving
  • Soil Stabilization
  • Stamped, stained and colored concrete

 

FedEx Building Addition

Scope of Work:

  • 65,000 s.f.  build 
  • Turn key structural concrete
  • Paving
  • Earthwork
  • Storm sewer

Holman Boiler

Scope of Work:

  • Turn-key concrete for tilt-wall manufacturing facility

Duke Glass Manufacturing

Scope of Work:

  • Paving addition
  • Soil stabilization & grading
  • Concrete paving

FED-EX Distribution Center Addition

College Station, TX

Scope of Work:

  • Turn-key concrete
  • Drilled piers

 

90 AC Site Development

Scope of Work

  • Clearing
  • Earthwork
  • Grading
  • Stabilization

Location:  Baytown, TX